So I guess its time to start a thread of this years collection...... last years thread
well there's not much to say for parts but.... Holy Fawk these are good parts.
so for this winters Build.... here's the plan.
1) 8.8 Install... EDI... March 1st (Completed March 3rd)
2) Shackle reversal... EDC... March 17th
3) body wiith boatsides... EDC... March 20th
4) D44/D30 Hybrid... EDI... April 30th
So as you all know I have built myself a shaved 8.8 for the heep... Thread here it is ready... so next weekend it's going in.
I am also in the completion stages of the design and modification of the outers and knukles of the D30. They will be sporting D44 locking hubs as well as the rotors and calipers. Thread here
The shackle reversal I think will be tough, but I've done my research and I believe that with the crew I have this will be a very successful upgrade. With this modification I am moving the front axle forward 2-3".
I have planned 3 days for this Event, with 1-2 days Prep time.
Here is a link to the poll I created
Link to the rear frame repairs.
the boatside.... Hmmmmm.... I'm almost 100% certain that I will do the boatsiding.... I figure it will cause me less agrivation as I have to repair the tub in these locations anyways. On this I'm flying buy the seat of my pants... I've seen a few Jeeps with it done, don't think its a big issue.... I can do it. this one will take 5-6 days.... but will overlap the frame work.
total time 10 days..... for frame and sides...... gonna be a busy 10 days. I have a crew coming.... it should go well.